I'm looking to move the water tank manifold to the small box shelf under the oven, just like illustrated and discussed by Bruce Landsberg. https://www.catalina36.org/members/technical/upgrades/plumbing-system-makeover
I have a question regarding the bulkhead he drilled for the fresh water lines. The bulkhead is located under and forward of the oven. Is this a structural supporting bulkhead? Instead of drilling 4 separate holes, I was thinking of drilling 1 - 2 1/4" hole, and putting a 2 1/4" hose (of the same construction but heavier walls as the fresh water lines), and use this large hose for chafe protection.
Any comments, concerns, or recommendations are greatly appreciated.
Robert Trinkle
Troubador, 1995 C36 MKII #1433, SR/WK
Universal M35A
Kinsale Harbor Marina
Kinsale, VA
Replying to my own post. The bulkhead in question is an athwartship bulkhead.
Robert Trinkle
Troubador, 1995 C36 MKII #1433, SR/WK
Universal M35A
Kinsale Harbor Marina
Kinsale, VA